| Step 1 Measuring and Ordering | | | | Step 2 Soil Preparation |
| Measure the area to be sodded. Take into account | | | | First, loosen the soil to a depth of about 4 to 6 inches. |
| any mounds, hills, or valleys in the area to be sodded, | | | | A garden rototiller works great. |
| as they will increase the amount of sod needed due to | | | | Next, rake out any large rocks and other unwanted |
| the fact that it is not a flat surface. | | | | materials. Slope the soil away from buildings, |
| Make sure that all other prep work is done and that | | | | driveways, etc. to eliminate drainage problems. Smooth |
| your irrigation system is working properly. Sod needs | | | | the soil keeping a constant grade while filling in any |
| water within 30 minutes of being installed. | | | | holes. Keep the grade about 1 1/2 to 2 inches below |
| We cut our sod after receiving your order (usually the | | | | driveways and sidewalks. Roll the area with a lawn |
| same day it is delivered) so you can be assured of | | | | roller. This will firm up the soil and reveal any low spots. |
| the finest quality. | | | | |